Compagnie MECO Load testing Lifting beam

Our French partner Compagnie MECO was responsible for project management for the load testing of four lifting beams for the French energy sector.

In accordance with French regulations, we test 150% of the WLL over a period of 15 minutes. The test is attended by DEKRA. LIFTAL organises everything related to this test operation: lifting plan, equipment and a motivated team. Applied load: 4x 127.5 tonnes

General questions?

Call us!

+31 (0) 118 - 488 450

Visual Projecten
Back to the top of the website